Shop drawings show exactly what will be built and how it will be attached. For a sign package they typically include:
- Elevations showing the sign on the facade or wall, with overall dimensions
- Sign faces with letter heights, artwork, colors, and finishes
- Materials and construction details
- Attachment and mounting details for the wall or structure
- Lighting and power notes for illuminated signs
A sign schedule, also called a message schedule, lists every sign in a package by type, location, and message. It keeps larger interior and ADA packages organized from submittal to install.
Depending on the job, the architect, owner, landlord, GC, and any licensed applicant review the drawings before fabrication. Clear, complete drawings make those reviews easier, but they don't guarantee a timeline or an approval.
Landmarks and historic districts
If the building is an individual landmark or in a historic district, you need an LPC permit before installing or replacing signs, awnings, or related lighting. LPC applications are filed through Portico, LPC's online permit portal. You can check a building's status on LPC's Discover NYC Landmarks map. LPC's Permit Guidebook has separate chapters for signage and awnings that list what a complete application needs.
Storefront awnings: layout, recover, and sign text
Interior wayfinding and directory packages
Landlord sign criteria
Many leases and buildings set their own sign rules, such as sign band size, allowed materials, lighting, and attachment methods. Arc asks for those criteria at quote and designs to them.
FDNY
Some projects also involve FDNY-related signage or review. Arc coordinates with the project team where that applies.